
Load-bearing wall removal across Sydney
The job that turns a closed-off floorplan into one open room. We handle the propping, the beam and the opening, and hand it back square and ready for the next trade.
Get a Free Quote
How can we reach you?
- Licensed & insured
- Sydney-wide
- Free quotes
What does removing a load-bearing wall actually involve?
Removing a load-bearing wall means transferring the weight it carries onto a new beam. The floor or roof above is propped first, the beam goes in sized to the load it carries, and posts carry that load down through the floor to the footings. It is a structural job, not a demolition job.
At a glance
- Time on site: One to three days for a single opening, once the beam is sized and approvals are sorted.
- Engineer: Not always. Simpler timber jobs can be sized from AS 1684.2 span tables. Steel, long spans and concentrated loads need one.
- Approval: Usually a Complying Development Certificate through a private certifier. Strata needs owners corporation approval too.
- Beam options: Timber LVL for shorter spans, steel UB or PFC for longer spans and heavier loads.
- Handed over: Opening squared and trimmed, ready for the plasterer. We don't patch or paint.
- Area: Sydney-wide, from a base in Dulwich Hill
What the job actually covers
Five things, in the order they happen. The first one is where the risk is, and the second is where jobs go wrong.
Working out what the wall carries
Before anything comes out we establish what is sitting on the wall: floor joists, ceiling joists, roof load, or another wall above it. That determines the beam, and it is the difference between a straightforward job and an expensive surprise.
Temporary propping
Acrow props and bearers on both sides of the wall, taking the floor above before a single stud is cut. This is the part of the job that keeps the house standing and the part that gets rushed on bad sites. We don't rush it.
Beam supply and installation
Timber LVL for shorter spans, steel universal beam or PFC where the span or the load is bigger. Fixed to the span tables or the engineer's detail, whichever the job calls for, packed the way the drawing specifies.
Posts and the load path
A beam is only as good as what holds it up. We install the posts and make sure the load carries down through the floor structure to something that can take it, rather than stopping at a floorboard.
Making the opening good
Squared, straight and ready for the plasterer. Nogging, trimming and packing done so the finishing trades aren't fixing our work before they start theirs.
Working out what the wall is carrying
Most of the risk in this job is decided before anyone picks up a tool. A wall that looks identical to the one next to it might be carrying the roof, or it might be carrying nothing but its own weight.
If it's ambiguous, the answer is to open up a small section of ceiling and look. That costs an hour. Getting it wrong costs a great deal more.
- Joist direction. Floor and ceiling joists have to land on something. If they run across the top of the wall rather than alongside it, the wall is taking that load.
- What is above it. A wall stacked under another wall, a bathroom, or a roof strut is part of a load path running down to the footings.
- The floor space below. In a suspended-floor house, a load-bearing wall will usually have its own bearer and piers underneath.
- Age and construction. Older Sydney housing has been altered more than most people expect, and the current load path is often not the original one.
Propping is the part that matters
Once the wall comes out, the floor above has to be held by something. Temporary propping goes in on both sides, taking the joists onto bearers and down through acrow props to a solid bearing point.
Two things go wrong on badly run sites: props that aren't landing on anything substantial, and props that come out too early. Both cause the same thing, which is movement in the floor above and cracking in the ceilings and cornices you were hoping to keep.
We leave propping in until the beam and its posts are permanently carrying the load.
Flush beam or dropped beam
This is usually the choice that most affects how the finished room feels, and the one worth understanding before you get quotes.
Dropped beam
The beam sits below the ceiling line.
- Ceiling
- Visible bulkhead across the room
- Work involved
- Joists stay put, beam picks up underneath
- Cost
- Lower
- Best for
- Larger rooms where a bulkhead reads as a detail
Flush beam
The beam sits up inside the floor structure.
- Ceiling
- Runs through unbroken, no trace of the wall
- Work involved
- Every joist cut and hung off the beam on hangers
- Cost
- Higher
- Best for
- Open-plan kitchen and living, and small rooms
A flush beam is only possible if the depth the beam needs fits within the available floor depth. That single constraint is usually what decides steel versus timber. We'll tell you at quote stage which your job can support.
From first call to handover
- 01
Site visit
We look at the wall, what sits above it and what's in the ceiling space, and tell you honestly whether it's load-bearing, what removing it will take, and whether it needs an engineer.
- 02
Sizing the beam
Simpler timber jobs we size ourselves from the span tables and show you the working. Anything outside that scope goes to a structural engineer and we build to their drawing.
- 03
Prop, remove, install
Props go in, the wall comes out, the beam goes in and the posts are fixed. Most single openings are done in one to three days on site.
- 04
Handover
Props come out once everything is permanently supported, the site is cleaned up and the opening is left ready for the plasterer.
Get a quote on your wall removal
Send through your plans, your engineer's drawings, or just a few photos of the wall. We'll come back to you with the next steps, no obligation.
- Free, no-obligation quote
- Licensed & insured
- Sydney-wide
Where these jobs go over budget
In roughly this order of frequency. All four are cheaper to find at quote stage than mid-job, which is the whole argument for a proper look before anyone commits to a number.
Services buried in the wall
Power, switches, data, sometimes plumbing. All of it has to go somewhere else, and that's an electrician and possibly a plumber. Very common in older homes.
Beam access
A beam that can't be carried in needs craning or splicing. Discovered late, it means redesigning after the steel has already been specified.
Inadequate bearing
The load arriving at each end of the beam is concentrated into a small area. If it lands on two courses of old brickwork, you're into new footings.
Previous unapproved work
Opening a ceiling and finding somebody else's renovation has already moved load onto this wall. It happens more than you'd think.
Wall removal questions
Not covered here? Call 0420 223 223 and ask. We'd rather answer it than have you guess.
How do I know if a wall is load-bearing?
Do I need council approval to remove a load-bearing wall in Sydney?
Do I need a structural engineer?
How long does the job take?
Can the beam be hidden so the ceiling stays flat?
Can you remove a wall in an apartment?
What does it cost to remove a load-bearing wall?
The rest of what we do
Wall removals rarely arrive on their own. These are the trades that usually come with them.
Structural Steel
Steel beams, posts and lintels for the spans and loads timber can't carry in a workable depth.
Timber Framing
Floor, wall and roof frames for new builds, extensions and additions, built to plan and left plumb.
Roofing
Roof structures framed properly, as a standalone job or as part of a build we're already on.
